I hope so LOL! I am going to be really pressed for time I got a 2 week period to get my boat ready
Here a list of projects i gotta get done before she's ready LOL!
1) Find Livewell pumps (because they weren't in the same spot as my bilge)
2) Install a Tach
3) Install a Trim Switch by the drivers seat
4) Un-Winterize the motor
a. Test all warning horns
b. DOUBLE CHECK VRO! (Really thinking about disconnecting it and just mixing my gas and oil )
c. Change plugs
5) Fix a few dings in my gel coat because some dumbies with a big cruiser that they didn't know how to drive. Mushed through a channel and pretty much put my boat on top of a dock while it was tied up, snapping boat ropes (1/2 inch thick).
If you can imagine waves big enough to lift a 17' Ranger high enough to put from the transom to about 3/4 the length of the boat almost right on top of the dock. Good thing I wasn't having a nap or she would have floated away :S
I'll stop now because I still gotta go over the trailer LOL!.